A net-change MRP system is one that is updated periodically but not less frequently than once a week.

A) True
B) False

Correct Answer

verifed

verified

MRP II did not replace or improve the basic MRP.

A) True
B) False

Correct Answer

verifed

verified

ERP implementation requires support and a direct mandate from the CEO because it impacts so many different functional areas.

A) True
B) False

Correct Answer

verifed

verified

Which of the following is not usually necessary in order to have an effective MRP system?


A) a computer and software
B) an accurate bill of materials
C) lot-for-lot ordering
D) an up-to-date master schedule
E) integrity of file data

F) None of the above
G) D) and E)

Correct Answer

verifed

verified

If 17 Ps are needed, and no on-hand inventory exists for any items, how many Cs will be needed?


A) 8
B) 16
C) 136
D) 204
E) 272

F) C) and D)
G) B) and C)

Correct Answer

verifed

verified

How many Dark Chocolate Eggs should be ordered?


A) 310
B) 450
C) 500
D) 550
E) 600

F) D) and E)
G) A) and E)

Correct Answer

verifed

verified

Lumpy demand for components results primarily from the periodic scheduling of batch production.

A) True
B) False

Correct Answer

verifed

verified

Which one of the following most closely describes net material requirements?


A) gross requirements - amount on-hand - scheduled receipts
B) gross requirements - planned receipts
C) gross requirements - order releases + amount on-hand
D) gross requirements - planned order releases
E) gross requirements - amount on-hand + planned order releases

F) C) and D)
G) None of the above

Correct Answer

verifed

verified

Given the following data, construct a material requirements plan which will result in 100 units of Parent #1 (P1) at the beginning of week 6, and 200 units of Parent #2 (P2) at the beginning of week 8: B.

Correct Answer

verifed

verified

blured image blured image Item A has an on-hand balanc...

View Answer

Net requirements for component J are as follows: 60 units in week 2, 40 units in week 3, and 60 units in week 5.If a fixed-period, two-period lot-sizing method is used, what will be the quantity of the first planned receipt?


A) 60 units
B) 120 units
C) 180 units
D) Cannot be determined
E) None of the above

F) C) and D)
G) B) and D)

Correct Answer

verifed

verified

Which of the following represents an attempt to balance the benefits of stability against the benefits of responding to new information?


A) safety stock
B) safety time
C) bills of material
D) time fences
E) fixed-period lot sizing

F) A) and C)
G) D) and E)

Correct Answer

verifed

verified

D

A regenerative MRP system is one that is updated continuously - every time there is a schedule change.

A) True
B) False

Correct Answer

verifed

verified

False

Back flushing takes place after the production has been completed.

A) True
B) False

Correct Answer

verifed

verified

MRP really doesn't apply to services since raw material isn't required.

A) True
B) False

Correct Answer

verifed

verified

The identification of parent items is called:


A) Paternity
B) Pegging
C) Requirement I.D.
D) Relationship tracking
E) Master Scheduling

F) D) and E)
G) B) and E)

Correct Answer

verifed

verified

The gross requirements value for any given component is equal to the net requirements of that component's immediate parent multiplied by the quantity per parent.

A) True
B) False

Correct Answer

verifed

verified

In MRP, under lot-for-lot ordering, "planned-order receipts" are:


A) identical to "scheduled receipts"
B) identical to "planned-order releases"
C) open orders (that is, ordered before the first time bucket, but not delivered yet)
D) "gross requirements"
E) available to promise inventory

F) A) and E)
G) A) and D)

Correct Answer

verifed

verified

MRP output reports are divided into two main groups - daily and weekly.

A) True
B) False

Correct Answer

verifed

verified

The term pegging refers to identifying the parent items that have generated a given set of material requirements for a part or subassembly.

A) True
B) False

Correct Answer

verifed

verified

What is the net requirement for Dark Chocolate Truffles to fill this order?


A) 100
B) 140
C) 150
D) 180
E) 200

F) C) and D)
G) B) and C)

Correct Answer

verifed

verified

C