What is the objective function?


A) $2 L + $3 D = Z
B) $2 L + $4 D = Z
C) $3 L + $2 D = Z
D) $4 L + $2 D = Z
E) $5 L + $3 D = Z

F) None of the above
G) A) and E)

Correct Answer

verifed

verified

A constraint that does not form a unique boundary of the feasible solution space is a:


A) redundant constraint
B) binding constraint
C) non-binding constraint
D) feasible solution constraint
E) constraint that equals zero

F) B) and E)
G) C) and D)

Correct Answer

verifed

verified

A shadow price indicates how much a one-unit decrease/increase in the right-hand side value of a constraint will decrease/increase the optimal value of the objective function.

A) True
B) False

Correct Answer

verifed

verified

In the range of feasibility, the value of the shadow price remains constant.

A) True
B) False

Correct Answer

verifed

verified

What is the objective function?


A) $0.50 D + $0.40 C = Z
B) $0.20 D + $0.30 C = Z
C) $0.40 D + $0.50 C = Z
D) $0.10 D + $0.20 C = Z
E) $0.60 D + $0.80 C = Z

F) A) and B)
G) A) and E)

Correct Answer

verifed

verified

What is the objective function?


A) $4.00 A + $1.00 B = Z
B) $0.25 A + $1.00 B = Z
C) $1.00 A + $4.00 B = Z
D) $1.00 A + $1.00 B = Z
E) $0.25 A + $0.50 B = Z

F) A) and B)
G) None of the above

Correct Answer

verifed

verified

It has been determined that, with respect to resource X, a one-unit increase in availability of X would lead to a $3.50 increase in the value of the objective function.This value would be X's _______.


A) range of optimality
B) shadow price
C) range of feasibility
D) slack
E) surplus

F) B) and E)
G) A) and C)

Correct Answer

verifed

verified

Which of the following is not a feasible production combination?


A) 0 A & 0 B
B) 0 A & 400 B
C) 200 A & 300 B
D) 400 A & 0 B
E) 400 A & 400 B

F) A) and D)
G) A) and B)

Correct Answer

verifed

verified

Which of the following is not a feasible production combination?


A) 0 B & 0 C
B) 0 B & 1,100 C
C) 800 B & 600 C
D) 1,100 B & 0 C
E) 0 B & 1,400 C

F) B) and D)
G) D) and E)

Correct Answer

verifed

verified

When a change in the value of an objective function coefficient remains within the range of optimality, the optimal solution would also remain the same.

A) True
B) False

Correct Answer

verifed

verified

Solve the following linear programming problem: Solve the following linear programming problem:

Correct Answer

verifed

verified

A change in the value of an objective function coefficient does not change the optimal solution.

A) True
B) False

Correct Answer

verifed

verified

What is the constraint for sugar?


A) 2 D + 3 C \le 4,800
B) 6 D + 8 C \le 4,800
C) 1 D + 2 C \le 4,800
D) 3 D + 2 C \le 4,800
E) 4 D + 5 C \le 4,800

F) A) and B)
G) A) and C)

Correct Answer

verifed

verified

What are optimal daily profits?


A) $0
B) $240
C) $420
D) $405
E) $505

F) B) and D)
G) B) and C)

Correct Answer

verifed

verified

What combination of x and y will yield the optimum for this problem? What combination of x and y will yield the optimum for this problem?   A) x = 2, y = 0 B) x = 0, y = 0 C) x = 0, y = 3 D) x = 1, y = 5 E) none of the above


A) x = 2, y = 0
B) x = 0, y = 0
C) x = 0, y = 3
D) x = 1, y = 5
E) none of the above

F) A) and E)
G) C) and D)

Correct Answer

verifed

verified

The theoretical limit on the number of decision variables that can be handled by the simplex method in a single problem is:


A) 1
B) 2
C) 3
D) 4
E) unlimited

F) D) and E)
G) A) and B)

Correct Answer

verifed

verified

The term "iso-profit" line means that all points on the line will yield the same profit.

A) True
B) False

Correct Answer

verifed

verified

In graphical linear programming the objective function is:


A) linear
B) a family of parallel lines
C) a family of iso-profit lines
D) all of the above
E) none of the above

F) None of the above
G) A) and B)

Correct Answer

verifed

verified

For the production combination of 135 Lite and 0 Dark which resource is "slack" (not fully used) ?


A) time (only)
B) malt extract (only)
C) both time and malt extract
D) neither time nor malt extract
E) cannot be determined exactly

F) A) and B)
G) B) and E)

Correct Answer

verifed

verified

For the purchase combination 0 King Beds and 200 Queen Beds, which resource is "slack" (not fully used) ?


A) investment money (only)
B) storage space (only)
C) both investment money and storage space
D) neither investment money nor storage space
E) cannot be determined exactly

F) C) and D)
G) A) and B)

Correct Answer

verifed

verified

Showing 81 - 100 of 105

Related Exams

Show Answer