Filters
Question type

Study Flashcards

Sign-off is the users' actual signatures indicating they approve all of the business requirements.

A) True
B) False

Correct Answer

verifed

verified

Nearshore outsourcing occurs when using organizations from developing countries to write code and develop systems.In offshore outsourcing the country is geographically far away.

A) True
B) False

Correct Answer

verifed

verified

Which programming language looks similar to human languages?


A) First generation machine language
B) Second generation machine language
C) Third generation machine language
D) Fourth generation machine language

E) B) and D)
F) All of the above

Correct Answer

verifed

verified

What are factors considered to be true,real,or certain without proof or demonstration?


A) Project plan
B) Project constraints
C) Project assumptions
D) Project deliverable

E) B) and D)
F) A) and B)

Correct Answer

verifed

verified

Corrective maintenance makes system changes to reduce the chance of future system failure.

A) True
B) False

Correct Answer

verifed

verified

Prototyping is a modern design approach by which the designers and system users use an iterative approach to building the system.

A) True
B) False

Correct Answer

verifed

verified

Iterative development consists of a series of tiny projects.It has become the foundation of multiple agile methodologies.

A) True
B) False

Correct Answer

verifed

verified

What are software suites that automate systems analysis,design,and development?


A) Data flow diagram
B) Computer-aided software engineering (CASE) tools
C) Systems development life cycle
D) Process modeling

E) None of the above
F) All of the above

Correct Answer

verifed

verified

The oldest and the best known method is the agile methodology,a sequence of phases in which the output of each phase becomes the input for the next.

A) True
B) False

Correct Answer

verifed

verified

Describe the seven phases of the systems development life cycle.

Correct Answer

verifed

verified

Planning phase-involves establishing a h...

View Answer

Project assumptions represent key dates when a certain group of activities must be performed.

A) True
B) False

Correct Answer

verifed

verified

What is an arrangement by which one organization provides a service or services for another organization that chooses not to perform them in-house?


A) In-sourcing
B) Outsourcing
C) Business process outsourcing
D) Offshore outsourcing

E) B) and C)
F) A) and B)

Correct Answer

verifed

verified

User acceptance testing (UAT)determines if the system satisfies the user and business requirements.

A) True
B) False

Correct Answer

verifed

verified

What is a project?


A) A temporary activity undertaken to create a unique product,service,or result
B) The application of knowledge,skills,tools,and techniques to project activities in order to meet or exceed stakeholder needs and expectations from a project
C) Any measurable,tangible,verifiable outcome,result,or item that is produced to complete a project or part of a project
D) Represent key dates when a certain group of activities must be performed

E) None of the above
F) A) and B)

Correct Answer

verifed

verified

Onshore outsourcing occurs when engaging another company within the same country for services.

A) True
B) False

Correct Answer

verifed

verified

Summarize the different software development methodologies.

Correct Answer

verifed

verified

There are a number of different software...

View Answer

Rapid application development (RAD)methodology (also called rapid prototyping)emphasizes extensive user involvement in the rapid and evolutionary construction of working prototypes of a system,to accelerate the systems development process.

A) True
B) False

Correct Answer

verifed

verified

Preventative maintenance makes system changes to reduce the chance of future system failure.

A) True
B) False

Correct Answer

verifed

verified

What are project constraints?


A) Specific factors that can limit options
B) Factors that are considered to be true,real,or certain without proof or demonstration
C) Quantifiable criteria that must be met for the project to be considered a success
D) A document issued by the project initiator or sponsor that formally authorizes the existence of a project and provides the project manager with the authority to apply organizational resources to project activities

E) B) and D)
F) C) and D)

Correct Answer

verifed

verified

In a Gantt chart,tasks are listed __________ and the project's time frame is listed ____________.


A) vertically,horizontally
B) horizontally,vertically
C) vertically,vertically
D) horizontally,horizontally

E) A) and B)
F) None of the above

Correct Answer

verifed

verified

Showing 221 - 240 of 321

Related Exams

Show Answer