Filters
Question type

Study Flashcards

In cellular manufacturing, machines and equipment are grouped by type (e.g., all grinders are grouped into a cell).

A) True
B) False

Correct Answer

verifed

verified

A company needs to rebalance a product layout for producing new plastic license plates. They plan to use the assembly line 6 hours in order to meet projected demand of 2,160 license plates each day. The following table describes the tasks involved in the production of this product: A company needs to rebalance a product layout for producing new plastic license plates. They plan to use the assembly line 6 hours in order to meet projected demand of 2,160 license plates each day. The following table describes the tasks involved in the production of this product:   Without regard to projected demand, what is the minimum possible cycle time for this assembly line? A) 0 seconds B) 3 seconds C) 9 seconds D) 10 seconds E) 28 seconds Without regard to projected demand, what is the minimum possible cycle time for this assembly line?


A) 0 seconds
B) 3 seconds
C) 9 seconds
D) 10 seconds
E) 28 seconds

F) A) and E)
G) All of the above

Correct Answer

verifed

verified

A company has an assembly line with 34 tasks. The longest task is 4.7 minutes and the total time for all tasks is 92 minutes. The line will operate for 615 minutes per day.What is the minimum cycle time?


A) 34 minutes
B) 4.7 minutes
C) 92 minutes
D) 130 minutes
E) 615 minutes

F) A) and B)
G) A) and E)

Correct Answer

verifed

verified

The percentage of idle time in an assembly line is called cycle time.

A) True
B) False

Correct Answer

verifed

verified

A cafeteria line would be an example of a process-focused layout.

A) True
B) False

Correct Answer

verifed

verified

QRS Corp. is designing a product layout for a new product. They plan to use this production line 10 hours a day in order to meet forecasted demand of 900 units per day. The following table describes the tasks necessary to produce this product: QRS Corp. is designing a product layout for a new product. They plan to use this production line 10 hours a day in order to meet forecasted demand of 900 units per day. The following table describes the tasks necessary to produce this product:   For output to equal forecasted demand, what will be the second task performed at the second workstation of the production line that uses the fewest number of stations? A) a B) b C) c D) d E) e For output to equal forecasted demand, what will be the second task performed at the second workstation of the production line that uses the fewest number of stations?


A) a
B) b
C) c
D) d
E) e

F) B) and C)
G) C) and D)

Correct Answer

verifed

verified

Repetitive processing systems repetitively rotate production through small batches of a variety of products.

A) True
B) False

Correct Answer

verifed

verified

Which term is most closely associated with cellular manufacturing?


A) part families
B) assembly line
C) robotics
D) CAD
E) CAM

F) D) and E)
G) A) and C)

Correct Answer

verifed

verified

In an environment in which demand is both substantial and stable, _____ technology tends to be the best choice.


A) batch production
B) fixed automation
C) project production
D) programmable automation
E) flexible automation

F) C) and E)
G) D) and E)

Correct Answer

verifed

verified

Which type of processing system tends to produce the most product variety?


A) assembly
B) job shop
C) batch
D) continuous
E) mass customization

F) A) and B)
G) C) and D)

Correct Answer

verifed

verified

For a production line, daily capacity can be determined by dividing the daily operating time by the line's cycle time.

A) True
B) False

Correct Answer

verifed

verified

Which one of the following is not common to product layouts?


A) a high rate of output
B) specialization of labor
C) low unit costs
D) ability to adjust to changes in demand
E) special-purpose technology

F) C) and E)
G) B) and C)

Correct Answer

verifed

verified

A process layout is more susceptible to shutdowns caused by equipment breakdowns than a product layout.

A) True
B) False

Correct Answer

verifed

verified

Which phrase most closely describes flexible manufacturing systems?


A) a variation of CAD
B) a more fully automated version of cellular manufacturing
C) manufacturing resource planning
D) a process layout with a manufacturing overlay
E) an approach that allows workers to begin work at a time of their choosing

F) A) and B)
G) A) and E)

Correct Answer

verifed

verified

If a line is balanced with 80 percent efficiency, the "balance delay" will be


A) 20 percent.
B) 80 percent.
C) 100 percent.
D) unknown, since balance delay is not related to efficiency.
E) depends on the next operation.

F) C) and D)
G) A) and B)

Correct Answer

verifed

verified

A group of machines including supervisory computer control, automatic material handling, and possibly robots is called


A) computer-aided design.
B) a manufacturing cell.
C) computer-aided manufacturing.
D) computer-integrated manufacturing.
E) a flexible manufacturing system.

F) B) and D)
G) A) and D)

Correct Answer

verifed

verified

Right-sized equipment tends to be larger than equipment used in traditional process layouts.

A) True
B) False

Correct Answer

verifed

verified

Showing 121 - 137 of 137